Product Journal

Daily notes on building and improving djamespoer.com. Open the Buildometer project instruments.

The original automated Scrum Brief archive was replaced after review showed that reusable project-status metadata had been interpreted as day-by-day project activity. The corrected archive was reconstructed from dated project evidence so each entry reflects what was actually happening in its reporting period.

Executive Scrum Brief —

Daily report

Work shifted toward application structure and stability: initial-route layout shift was addressed, navigation and Work routes were reorganized, and the reusable case-study presentation began taking shape.

A later verification attempt hit a Node/libuv runtime assertion that blocked tests/build verification. That belongs in the historical record rather than being smoothed away.