Product Journal

Daily notes on building and improving djamespoer.com. Open the Buildometer project instruments.

The original automated Scrum Brief archive was replaced after review showed that reusable project-status metadata had been interpreted as day-by-day project activity. The corrected archive was reconstructed from dated project evidence so each entry reflects what was actually happening in its reporting period.

Executive Scrum Brief —

Reconstructed daily report

RECONSTRUCTED — no valid original daily brief existed for this date.

Mobile startup/performance work reduced Bedlam cost and deferred noncritical hydration/configuration.

Buildometer then evolved quickly: route-local evidence-backed instruments became a shared semantic cockpit, a normalized API and source-backed charts were added, and historical throughput/bug-cycle cohorts were corrected against the evidence.

By the approved T₀ checkpoint:

395 total / 152 shipped / 243 remaining — 38.5% complete.

The homepage gained a lightweight Buildometer teaser, durable daily production-development reports were automated, and the historical Scrum journal was backfilled.